PROPOSED DEVELOPMENT OF THREE STRATEGIC BORROWPITS IN THE GRAAFWATER-VREDENDAL AREA

Description:

The Western Cape Government (WCG): Department of Transport and Public Works is proposing to develop three strategic borrowpits in the Graafwater-Vredendal area for the sourcing of road-building material.  It is proposed to develop these borrowpits as long term sources for the rehabilitation and maintenance of gravel roads in the West Coast District Municipal area.  A Basic Assessment Report (BAR) and Environmental Management Programme Report is required for the development of the proposed borrowpits.

REPLACEMENT OF THE WESTLAKE CULVERT, LAKESIDE, CAPE TOWN

Description:

The City of Cape Town is proposing to replace the current culvert crossing of the Westlake River along Lakeside Main Road with a small new bridge structure.  This project forms part of the City of Cape Town's periodic maintenance and management interventions for its surface stormwater systems.  The proposed construction activities would be undertaken in line with a Maintenance Management Plan (MMP).  CCA has been appointed to compile the required MMP for the culvert replacement and future ongoing maintenance activities.

PROPOSED RE-GRAVELLING OF ROAD SECTIONS AND DEVELOPMENT OF 11 STRATEGIC BORROWPITS IN THE BITTERFONTEIN-NUWERUS AREA

Description:

The Western Cape Government (WCG): Department of Transport and Public Works is proposing to re-gravel sections of Main Road (MR) 547, MR736 and Divisional Roads (DR) 2231 in the Bitterfontein-Nuwerus area.  The proposed project also entails the development of 11 borrowpits for the sourcing of road-building material.  It is proposed to develop the borrowpits as strategic sources for long-term road repair and maintenance use.  A Maintenance Management Plan (MMP) is required as the re-gravelling project would entail maintenance work at various drainage channel crossings.  A Basic Assessment Report (BAR) and Environmental Management Programme Report is aslo required for the development of the proposed borrowpits.

PROPOSED UPGRADING OF THE ADAMS ROAD INTERCHANGE AT AMANZIMTOTI ON THE N2 SECTION 24, KWAZULU-NATAL

Description:

The South African National Roads Agency SOC Limited (SANRAL) originally identified the need to upgrade the Adams Road Interchange as part of the N2 Wild Coast Toll Highway project.  Environmental authorisation for the proposed upgrade was applied for as part of the Wild Coast project and is incorporated into the associated Record of Decision issued in 2010.  The current proposed layout and upgrade footprint, however, differ substantially from the original layout.  In order to accommodate the new layout and footprint, it is necessary to submit a new application and to undertake the required Basic Assessment process.  The proposed project entails the upgrade of the Adams Road Interchange and associated road network located within the town of Amanzimtoti.

PROPOSED UPGRADING OF THE ISIPINGO INTERCHANGE ON THE N2 SECTION 25, KWAZULU-NATAL

Description:

The South African National Roads Agency SOC Limited (SANRAL) is proposing to upgrade the existing Isipingo Interchange on the N2 Section 25 located approximately 21 km south of Durban.  The existing overpass bridge is susceptible to constant impact due to insufficient vertical clearance while the existing span over the N2 is not long enough to accommodate the future widening of the N2.  Traffic projections indicate that the bridge would also need to be widened to accommodate the predicted future traffic volumes.  The proposed project requires the undertaking of a Basic Assessment process and a Water use Licence Application process.